REVTERRA Engineering Dashboard
Tuesday, April 28, 2026
W18
Overall Progress
66%
Completed This Week
10
tasks done
In Progress
15
active tasks
Overdue
40
need attention
Team — Active Tasks
Narendra
S40MF-23
Thermal Analysis
Overdue
S40MF-3
S40 Simulation Review
Overdue
S40MF-25
Material Req. Analysis
Overdue
S40MF-24
Windage Losses
Overdue
S40MF-40
S40 Shaft Bolts - Torque Spec and Analysis
Overdue
ITFB-24
Alternating stress analysis on the bolts holding the top shaft to the top disc of the stacked design
Active
Completed this week (1)
Done
ITFB-37
Windage Losses Calc.
Gandhar
S40MF-9
Balancing Part Design
Overdue
S40MF-26
Bearing Design Report
Overdue
S40MF-30
Final Drawing Release
Overdue
S40MF-4
S40 Drawing Release
Overdue
ITFB-42
Bearing Design Report
Active
ITFB-65
ITFB Physical Shaft Coupler Design
Active
Completed this week (2)
Done
ITFB-55
Velicon Mounting Part Design
Done
ITFB-40
Sensor Mounts Design
Curtis
S40MF-6
Material Procurement
Overdue
S40MF-27
Parts Received QA
Overdue
ITFB-54
Velicon Mounting Parts Fab
Active
Satyam
S40MF-7
Balancing Shafts Fabrication
Active
S40MF-8
Balancing Operation
Overdue
ITFB-62
ITFB Motor Mount Fabrication
Active
S40MF-13
High Torque Mag. Coupler Procurement
Active
ITFB-63
ITFB Ancillary Parts Fab
Active
ITFB-64
ITFB Physical Shaft Coupler Parts Fab
Active
Zach
S40MF-16
Sensor Mounting
Overdue
ITFB-52
Sensor Mounting
Overdue
ITFB-49
Flywheel Assembly
Overdue
ITFB-51
55kW-3600 RPM Motor Integration
Overdue
S40MF-31
Induction Motor Integration for Mechanical Testing
Overdue
ITFB-7
ITF Parts Received
Overdue
ITFB-66
Velicon Motor Integration Assembly
Overdue
S40MF-14
Velicon Motor Integration
Open
Completed this week (2)
Done
ITFB-69
Detailed Drawing of Embedded Plate and Concrete Pad
Done
ITFB-29
Create drawing for ITF concrete pad, including anchors to bolt the ITF into, and including space for the Current Power enclosure to sit on
Ben
S40MF-22
System IO List
Active
S40MF-12
High Torque Mag. Coupler Design Confirmation
Active
S40MF-39
Document motor protection thresholds
Overdue
CPSP-36
Follow up: Shipping carrier recommendations from Noah
Active
ITFB-32
Share requirements with Skyworks and agree on timeline for site preparation
Active
S40MF-37
Finalize skid layout dimensions
Overdue
S40MF-38
Cable routing design (skid to flywheel)
Overdue
ITFB-44
Rotor Safety Design Factor Report
Active
+5 more
Completed this week (4)
Done
ITFB-41
Final IO list (internal)
Done
CPSP-33
Follow up: Temperature sensor vendor specs
Done
CPSP-31
Follow up: Control setpoint document (temp limits & safety params)
Done
CPSP-29
Follow up: Sine wave filter loss and voltage drop
Attention Needed
S40MF-22
System IO List
Ben Jawdat
Overdue
S40MF-23
Thermal Analysis
Narendra Gupta
Overdue
S40MF-3
S40 Simulation Review
Narendra Gupta
Overdue
S40MF-12
High Torque Mag. Coupler Design Confirmation
Ben Jawdat
Overdue
Needs Scheduling
(2)
CPSP-24
Pad Steel Fabrictaion
Zach Galvarro
CPSP-25
Pad Concrete Pour
Satyam Shukla